Covering the Anaerobic Pond at Wadi Gaza WWTP

 Client: ICRC     
 Owner
: CMWU

 Saqqa & Khoudary won the Design and Build contract in June 2014.  The creative and innovative design was a remarkable achievement.   The works are primarily covering the anaerobic pond using floating modular-cover made of HDPE geo-membrane, supplying and installing bio-gas collection, conveyance and treatment system. This includes HDPE perforated pipes, a blower, bio-gas treatment and flaring equipment. The contract also includes constructing rainwater drainage system, training the operation team, and providing all necessary infrastructure utilities to operate and maintain the facility in the most efficient and effective manner.   The testing, commissioning, handing over, and operation took place in March 2015.

Visits: 14