Electro-mechanical refurbishment for water and wastewater facilities throughout Gaza Strip as a result of the 'Protective Edge' operation on Gaza

Client: ICRC

In August 2014, SAK conducted emergency repairs during cease-fire time for part of the water and wastewater infrastructure and facilities throughout Gaza Strip that are damaged/ malfunctioned during the Israel offensive; 'Protective Edge'. This includes but not limited to repairs of networks, electromechanical refurbishment for water and wastewater facilities, supply and install of pumps etc.

Visits: 81