Hebron WWTP Access Road

Client: USAID
Saqqa & Khoudary signed the multi-million contract in November, 2014.
This project is all about construction of 2 km road with all infrastructure utilities such as water supply, sewage collection, storm water drainage, and power supply systems. The contract scope includes construction of 1 km two- lane access road to the proposed Hebron WWTP, rehabilitation (widening, milling and overlay) of 1.1 km of existing paved road, construction of 2 km of 4'' and 2'' diameter water pipelines complete with associated valves, vaults, and accessories , construction of 600 m of 60'' diameter sewer pipe with manholes, outlet structures, and flow diversions, installing overhead medium voltage power lines and underground medium voltage power lines.

Visits: 76