USAID Projects

Biddu-Beit Anan Road

 Owner: USAIDThis project consists of constructing, upgrading, paving and milling 2.4 km of the Biddu Beit Anan Road in the Governorate of Jerusalem. The construction started in October, 2013 and finished in July, 2014.     The scope consists of excavation works, embankment filling, pavement layer construction, installation and/or rehabilitation of storm water drainage systems, installation of safety features (signage, road marking, cat eyes, and guardrails) etc ...

Ras Al Taweel & Al ‘Uddeisa Water Infrastructure Phase 1A and Al Safi Booster Station – Phase I Pipeline Connection

 Client: USAID Saqqa & Khoudary signed the multi-million contract in October, 2014. The objective of this Task Order is to improve water supply distribution capacity and flexibility in the West Bank Water Department’s (WBWD) southern area of operations. Specifically the project will improve distribution of water from the Halhul Reservoir and improve supply to Bani Naim and Yatta. This project scope includes the construction of 5 km of 500-mm diameter steel pipe transmission main, 5 km of 150 ...

Hebron WWTP Access Road

Client: USAID Saqqa & Khoudary signed the multi-million contract in November, 2014. This project is all about construction of 2 km road with all infrastructure utilities such as water supply, sewage collection, storm water drainage, and power supply systems. The contract scope includes construction of 1 km two- lane access road to the proposed Hebron WWTP, rehabilitation (widening, milling and overlay) of 1.1 km of existing paved road ...

Jericho Collection System Expansion – Phase 1A

Client: USAID In November, 2014, Saqqa & Khoudary signed the multi-million contract to construct a sewage collection system to be connected with the proposed 10,000 m3/day Jericho Wastewater Treatment Plant (WWTP) The project scope includes construction of 12.5 km of 8”diameter gravity sewers, 470 manholes, 2 km of 6” service laterals and 585 connection pits. The contract also includes paving and construction of 1 km of previous dirt roads ...