New Projects

Jericho Collection System Expansion – Phase 1A

Client: USAID In November, 2014, Saqqa & Khoudary signed the multi-million contract to construct a sewage collection system to be connected with the proposed 10,000 m3/day Jericho Wastewater Treatment Plant (WWTP) The project scope includes construction of 12.5 km of 8”diameter gravity sewers, 470 manholes, 2 km of 6” service laterals and 585 connection pits. The contract also includes paving and construction of 1 km of previous dirt roads ...

Hebron WWTP Access Road

Client: USAID Saqqa & Khoudary signed the multi-million contract in November, 2014. This project is all about construction of 2 km road with all infrastructure utilities such as water supply, sewage collection, storm water drainage, and power supply systems. The contract scope includes construction of 1 km two- lane access road to the proposed Hebron WWTP, rehabilitation (widening, milling and overlay) of 1.1 km of existing paved road ...

Ras Al Taweel & Al ‘Uddeisa Water Infrastructure Phase 1A and Al Safi Booster Station – Phase I Pipeline Connection

 Client: USAID Saqqa & Khoudary signed the multi-million contract in October, 2014. The objective of this Task Order is to improve water supply distribution capacity and flexibility in the West Bank Water Department’s (WBWD) southern area of operations. Specifically the project will improve distribution of water from the Halhul Reservoir and improve supply to Bani Naim and Yatta. This project scope includes the construction of 5 km of 500-mm diameter steel pipe transmission main, 5 km of 150 ...

Supply to CMWU Warehouse Materials Equipment and Spare Parts

Client: CMWU The supply contract, signed in December 2014, includes the procurement of materials, equipment and spare parts for water pumping and production facilities, wastewater pumping and treatment facilities, water and wastewater networks. Those include submersible electric motors, submersible pumps, vertical turbine multistage pumps, chlorine dosing pumps, sea water horizontal centrifugal feed pumps, energy exchangers for sea water RO ...

Construction of Wastewater Pump Station #11 in Gaza City

Client: QRC Owner: Municipality of GazaIn December 2014, Saqqa & Khoudary won the multi-million contract for the design review and construction of the largest sewage pumping station in the country. The project includes 15m-deep bulk excavation works, underwater excavation and concrete works, reinforced concrete structure (bar screen chamber, wet/dry wells etc.), service building, boundary wall, roads and landscaping; mechanical works such as sluice gates, manual and automatic bar screens ...

Gaza Power Plant Maintenance

The sole power plant in Gaza was badly damaged by the Israeli shelling in July 2015. The shutdown of the plant and consequently the disturbed electricity supply for the whole population of Gaza, imposed significant threats to the operation of vital infrastructure facilities such as water supply, water treatment plants, the sewage pumping facilities and treatment plant, hospitals and so on. Saqqa & Khoudary, promptly mobilised the adequate ...