Construction of Sheikh Redwan Rainwater Pump Station

The contract of Sheikh Radwan pumping station, the largest pumping station in the country, includes civil works such as 15m deep excavation, reinforced concrete wet pit, service building, electricity room,; mechanical works such as sluice gates, vertical turbine pumps with total pumping capacity of 6,000 m3/hr, gate and check valves, movable bridge, electrical works such as transformers, generators, cables, control, lighting, instrumentation etc. The contract also includes the construction of 2,500m 900mm-GRP pressure line from the pumping station to the sea in addition to 120 m of reinforced concrete pipes and 100 m of UPVC pipes. 

Construction of Sheikh Redwan Rainwater Pump Station

Sheik redwan, Gaza Strip
  • Qatari Committee for Gaza Reconstruction
  • Water Supply and Distribution
  • $2,935,204
  • June, 2017

Contact Us

Gaza Office
Palestine - Gaza - East Road No. (4)
Phone: 08-2454420
Fax: 08-2454421
Email: [email protected]

WestBank Office
Ramaallah - Nazeeh Qura Street
Phone: 08-2454420
Fax: 08-2454421
Email: [email protected]